NORFOLK (Dec. 2, 2020) A Sailor assigned to the amphibious assault ship USS Wasp (LHD 1) uses a forklift to offload integrated logistics overhaul (ILO) material from the ship on to a truck for transfer to storage in Building W-143. This is part of a first-of-its kind integrated logistics overhaul for a large deck amphibious assault ship as it also features the addition of a full repair parts analysis group. While this is a routine service provided to ships entering into a maintenance period, it was the first time they have provided this service for a Wasp-class ship. (U.S. Navy photo by Jim Kohler)